Bridge Repair, Town of Pittstown
Peak Engineering prepared contract drawings containing bridge scour repairs for a bridge over a stream in the Town of Pittstown, NY. The begin abutment was undermined for the full length and compromised the integrity of the laid up stone masonry abutment. A reinforced concrete scour apron was designed and installed. Peak Engineering also provided Construction Observation during installation.