Lift Plan for Removal of Pipe Tower, State of New Jersey
Peak Engineering PLLC prepared a demolition plan for the removal of a multi-story pipe tower in Bayonne, NJ. The plan included rigging details, calculations and drawings for use by the contractor to complete the demolition utilizing a barge crane.